(Spectrum Health) Butterworth Hospital 100 Michigan St NE Renovation Completed 1995 $1,100,000 show
(Spectrum Health) Butterworth Hsptl Bldg 100 Michigan NE New Construction Completed 1992 $3,900,000 show
(Spectrum Health) Butterworth Pkg Lot Barclay New Construction Completed 1993 $3,200,000 show
(Spectrum Health) Butterworth Pwr Plnt Ransom Ave NE New Construction Completed 1993 $6,000,000 show
(Spectrum Health) Med Office Bldg 221Michigan NE New Construction Completed 1992 $15,000,000 show
025 Division S 025 Division S Renovation Completed 2000 $3,000,000 show
100 Grandville 100 Grandville SW Renovation Completed 1997 $2,300,000 show
101 South Division 101 South Division Renovation Completed 2009 $4,500,000 show
120 Ionia SW 120 Ionia SW Renovation Completed 2000 $2,600,000 show
35 Oakes - The Forum 35 Oakes Renovation Planned 2011 n/a show
38 Commerce Parking Ramp 38 Commerce SW New Construction Completed 2010 $9,000,000 show
47 Commerce - Lambert Edwards 47 Commerce Renovation Under Construction 2010 n/a show
50 Monroe Place 50 Monroe NW,50 Monroe NW Renovation,Renovation Completed,Completed 1998,1999 $10,800,001,080,000 show
50 Monroe Place 50 Monroe NW,50 Monroe NW Renovation,Renovation Completed,Completed 1998,1999 $10,800,001,080,000 show
50 Monroe Place 050 Monroe NW Renovation Completed 1986 $12,600,000 show
65 Monroe Center Building 65 Monroe Center NW Renovation Completed 2008 $5,000,000 show
Ah Nab Awen Park Improvements Renovation Completed 2011 $350,000 show
Aldrich Place (95-99 Monroe Center NW) Renovation Completed 1997 $2,000,000 show
All City Kicks (Former Reptile House) 139 S Division Renovation Completed 2005 $143,000 show
Alten Place 015 Division S Renovation Completed 1999 $453,000 show
Amtrak Parking Lot Market and Wealthy Public Works Completed 2003 $482,148 show
Amway Grand Plaza 187 Monroe NW Renovation Completed 2001 $750,000 show
Amway Grand Plaza 187 Monroe NW Renovation Completed 1998 $1,200,000 show
Anheuser Ice House 72 Grandville SW Renovation Completed 2007 $1,650,000 show
Arena SkyWalk Ottawa to Campau Public Works Completed 1997 $3,500,000 show
Arena Station 025 Ottawa SW Renovation Completed 1997 $6,500,000 show
B. DeVries Office Bldg 234 N Division Bldg Renovation Completed 1991 $1,500,000 show
Bank One 200 Ottawa NW Renovation Completed 1995 $1,000,000 show
Barney Condominium 052 Monroe Center NW Renovation Completed 1984 $400,000 show
Beatnik Brewing 62 Commerce Renovation Proposed 2011 n/a show
Bicycle Factory Building 201 Front SW New Construction Completed 2009 $20,000,000 show
Blodgett Building 015 Ionia SW Renovation Completed 2001 $1,112,800 show
Blodgett Building 015 Ionia SW Renovation Completed 1992 $5,500,000 show
Boardwalk Apartments & Pkg Ramp 940 Monroe Renovation Completed 2001 $31,000,000 show
BOB Expansion 26 Monroe NW Addition Planned 2011 $5,000,000 show
Brass Works Building 648 Monroe NW Renovation Completed 2001 $8,000,000 show
Brass Works Building 648 Monroe NW Renovation Completed 2001 $600,000 show
Brickway Condominiums 56 Monroe Center NW Renovation Completed 2008 $1,500,000 show
Bridge Street Bridge N/A Public Works Completed 1988 $4,100,000 show
Bridgewater Place 333 Bridge NW New Construction Completed 1993 $55,000,000 show
Bulls Head Tavern 188 Monroe NW Renovation Completed 2000 $219,000 show
Butterworth Hospital Improvement 100 Michigan NE Renovation Completed 1989 $9,400,000 show
Butterworth Hospital North Bldg 221 Michigan NE. New Construction Completed 1989 $8,100,000 show
Butterworth Hospital South Tower 100 Michigan NE Addition Completed 1982 $13,500,000 show
Calder Plaza Office Building 250 Monroe NW New Construction Completed 1981 $11,200,000 show
Calumet Flats 303 Division S. Renovation Completed 1983 $150,000 show
Campau Avenue Monroe to Pearl Public Works Completed 2007 $2,000,000 show
Campau Avenue Monroe to Pearl Public Works Completed 1991 $275,000 show
Campau Square Building 180 Monroe NW Renovation Completed 1980 $1,200,000 show
Campau Square Plaza Office Bldg 099 Monroe NW New Construction Completed 1985 $17,000,000 show
Canal Street Park & Flood Walls North of Newberry Public Works Completed 2001 $2,125,000 show
Cathedral Square 267 Sheldon SE Renovation Completed 2008 $22,000,000 show
Catholic Central H.S. Classroom Bldg 319 Sheldon SE Addition Completed 1988 $3,000,000 show
Catholic Central H.S. Gymnasium 318 Division S. New Construction Completed 1984 $2,000,000 show
Catholic Central Math and Science Bldg 305 Sheldon SE New Construction Completed 2000 $1,000,000 show
Catholic Secondary Schools 359 Division S. Renovation Completed 1989 $800,000 show
Catholic Social Services 040 Jefferson SE Renovation Completed 2001 $3,960,000 show
Chaffee Apartments 128 S Division Av Renovation Completed 1998 $950,000 show
Charley's Crab Restaurant 063 Market SW New Construction Completed 1981 $2,700,000 show
Cherry St Landing WMU 200 Ionia SW Renovation Completed 2001 $2,500,000 show
Cherry St. Parking Structure Cherry & Commerce New Construction Completed 2007 $6,100,000 show
Cherry Street Brick Street Reconstr Ionia to Commerce Public Works Completed 2003 $978,000 show
Cherry Street Landing - Bank of Holland 75 Ionia SW New Construction Completed 2005 $2,200,000 show
Cherry Street Lofts - The Dayton Building 143 Cherry SE Renovation Completed 2006 $1,300,000 show
Cherry Street Reconstruction - Phase 2 Commerce to Division Public Works Completed 2009 $2,000,000 show
Cherry Street Reconstruction - Phase 3 Division to Sheldon Public Works Under Construction 2010 $700,000 show
Choice One 056 Grandville SW Addition Completed 2000 $1,600,000 show
City Center for State Offices 1 North Division Renovation Completed 2002 $10,840,000 show
City Center Plaza Shopping Mall 001 Monroe Center NW Renovation Replaced 1985 $13,500,000 show
City Flats Hotel (Fox Bldg) 83 Monroe Center NW Renovation Complete 2011 $3,000,000 show
City/ County Archive Center - Phase II 50 Jefferson SE New Construction Completed 2003 $7,435,000 show
City/County Archives Center Phase I Washington SE New Construction Completed 2000 $8,366,000 show
Civic Theatre 034 Division N. Renovation Completed 1989 $160,000 show
Civil War Monument Fulton and Monroe Center Public Works Completed 2003 $250,000 show
Comerica Bank 201 Monroe NW Renovation Completed 1986 $130,000 show
Commerce Avenue Reconstruction - Cherry St to Wealthy St Commerce Ave Renovation Under Construction 2010 $3,200,000 show
Commerce Bldg - Ferris State University 5 Lyon NW Renovation Completed 2004 $2,900,000 show
Commerce Street Reconstruction Fulton to Cherry Public Works Completed 2004 $2,500,000 show
Cooley Law School - Phase I 38 Oakes Renovation Completed 2004 $12,400,000 show
Cornerstone Bldg 089 Ionia NW Renovation Completed 1990 $1,000,000 show
DASH 9 Parking Lot - Phase I Lake Michigan and Seward Public Works Completed 2003 $1,200,000 show
DASH 9 Parking Lot - Phase II Lake Michigan and Seward Public Works Completed 2004 $1,200,000 show
DASH West Lots 7 & 8 Douglas to Lake Michigan Dr Public Works Completed 1997 $2,500,000 show
Day's Inn Hotel 310 Pearl NW New Construction Completed 1987 $10,000,000 show
Design Plus 201 Ionia SW Renovation Completed 2000 $2,100,000 show
DeVos Hall 245 Monroe NW Renovation Completed 2004 $5,000,000 show
DeVos Performance Hall 245 Monroe NW Renovation Completed 1994 $740,000 show
DeVos Place Convention Ctr - Phase I & II 245 Monroe Av NW New Construction Completed 2003 $220,000,000 show
Division Avenue Cherry to Oakes Public Works Completed 2005 $2,000,000 show
Division Park Avenue Apartments 209/217 South Division, 17 Williams Renovation Planned 2011 $11,000,000 show
DLP Inc 217 Grandville SW Addition Replaced 1992 $11,700,000 show
Donovan Building 71 S Division Renovation Completed 2004 $1,700,000 show
Douglas J. Aveda Institute 138 Commerce SW Renovation Completed 2007 $3,500,000 show
Downtown YMCA 475 Lake Michigan NW New Construction Completed 2005 $28,000,000 show
Dwelling Place - Martineau Apartments 106 - 130 S Division Renovation Completed 2005 $7,500,000 show
Dwelling Place Admin Bldg 101 Sheldon SE Renovation Completed 2003 $2,500,000 show
Dwelling Place Inc Bldg 343 Division S Renovation Completed 1991 $500,000 show
Dwelling Place Inn 040 to 052 Division S. Renovation Completed 1989 $700,000 show
East Riverbank Walkways Blue Bridge to Gillette Bridge Public Works Completed 2001 $750,000 show
Eastbank Plaza Towers 011 Monroe NW New Construction Completed 1992 $60,000,000 show
Eerdman Publishing Expansion 317 LaGrave SE Addition Replaced 1987 $200,000 show
Ellis Parking Ramp - 500 Space 119 Pearl NW New Construction Completed 2002 $9,000,000 show
EQ3 130 Ionia SW Renovation Completed 2002 $900,000 show
Family Care Medical Care Office Bldg 150 Jefferson SE Renovation Completed 1987 $1,000,000 show
Ferguson Hospital 072 Sheldon SE Renovation Replaced 1985 $100,000 show
Ferguson Hospital Doctor's Office 075 Sheldon SE New Construction Completed 1987 $2,000,000 show
Ferguson Renaissance Center 072 Sheldon SE Renovation Completed 2002 $11,260,000 show
Ferris State/Kendall/Christman Expansion - Old Art Museum 155 Division Ave N Renovation Planned 2012 $33,000,000 show
Fifth Third Bank 111 Lyon NW Renovation Completed 1997 $4,400,000 show
Fifth Third Bank (One Vandenberg Ctr) 111 Lyon NW Renovation Completed 1996 $2,000,000 show
Firestone Bldg 309 Jefferson SE Renovation Completed 1988 $350,000 show
Fish Ladder Park 624 Front NW Public Works Completed 1987 $200,000 show
Fish Ladder/Pump Statn N/A Public Works Completed 1993 $2,500,000 show
Fitzgerald Condominiums 33 Library NE Renovation Completed 2008 $20,000,000 show
Flanagan's Pub 139 Pearl NE Renovation Completed 1985 $600,000 show
Flat Iron Building 100, 112, 114 Monroe Center NW Renovation Under Construction 2010 $4,500,000 show
Flatiron Building 107-115 Ottawa NW Renovation Completed 1981 $500,000 show
Fmr Heartside Manor 35 Oakes SW Renovation Under Construction 2010 $5,000,000 show
Fmr Imperial Metals Building 801 Ionia Ave NW Renovation Planned 2011 $5,000,000 show
Fmr Opus Room 58 Ionia Ave SW Renovation Completed 1999 $1,200,000 show
Fmr Prime Bank Building 171 Monroe NW New Construction Completed 1982 $10,000,000 show
Former Central Bank Bldg 065 Monroe Center NW Renovation Replaced 1986 $1,200,000 show
Former Milner Hotel - Beta Design Group 70 Ionia SW New Construction Completed 2004 $5,000,000 show
Former Post Office Garage 250 Commerce SW Renovation Completed 2002 $940,000 show
Forslund's Condominium Housing 252 Pearl NW Renovation Completed 1984 $4,000,000 show
Founders Bldg 048 Fountain NW Renovation Completed 1987 $1,000,000 show
Founders Brewery 235 Grandville SW Renovation Completed 2007 $4,800,000 show
Founders Trust Bank Building 161 Monroe NW Renovation Completed 2007 $2,000,000 show
Frey Building 300 Ottawa NW Renovation Completed 1998 $300,000 show
Front Ave. Improvement Fulton to Pearl Public Works Completed 1987 $428,000 show
Front Row Condominiums 51-63 Monroe Center NW Renovation Completed 2006 $5,000,000 show
FSU/Kendall College 017 Fountain &110 Ionia NW Addition Completed 1999 $3,000,000 show
Fulton Street River to Division Ave Public Works Replaced 1991 $1,600,000 show
Fulton-Commerce Bldg 038 Fulton Renovation Completed 1987 $1,400,000 show
Furniture Building 082 Ionia NW Renovation Completed 1998 $975,000 show
Furniture Company Bldg 082 Ionia NW Renovation Completed 1980 $5,200,000 show
Gerald R Ford Presidential Museum 303 Pearl NW New Construction Completed 1981 $10,000,000 show
Gerald R. Ford Presidential Museum 303 Pearl NW Renovation Completed 2003 $6,350,000 show
Gillette Bridge Devos Place to Ah-Nab-Awen Park Public Works Completed 1998 $400,000 show
Globe Apartments 315 Commerce SW Renovation Completed 2001 $8,407,000 show
Goodspeed Building 190 Monroe NW Renovation Completed 2003 $1,300,000 show
Goodspeed Building 190 Monroe NW Renovation Completed 1982 $1,000,000 show
GR Children's Museum 11 Sheldon Av NE Renovation Completed 1997 $1,700,000 show
GR Museum - Van Andel Museum Center 272 Pearl St NW New Construction Completed 1994 $33,000,000 show
Grand Center/DeVos Hall, Pkg Ramp 245 Monroe NW New Construction Replaced 1980 $25,000,000 show
Grand Plaza Hotel 187 Monroe NW Renovation Completed 1982 $60,000,000 show
Grand Plaza Parking Ramp 218 Pearl NW New Construction Completed 1981 $7,700,000 show
Grand Plaza Place 220 Lyon NW Renovation Completed 1987 $6,400,000 show
Grand Rapids Art Museum 125 Monroe Center NW New Construction Completed 2007 $55,000,000 show
Grand Rapids Art Museum 155 Division N. Renovation Replaced 1981 $3,300,000 show
Grand Rapids Ballet Building 341 Ellsworth SW Renovation Completed 2002 $2,300,000 show
Grand Rapids Civic Theatre 34 N Division Renovation Completed 2006 $14,000,000 show
Grand Rapids Community Foundation HQ 185 Oakes SW Renovation Completed 2008 $3,000,000 show
Grand Rapids Museum Pkg Ramp (200 spaces) 310 Pearl NW New Construction Completed 1994 $3,000,000 show
Grand Rapids Police Dept 001 Monroe Ctr NW Renovation Completed 2001 $4,160,000 show
Grand Rapids Properties Bldg 64 Ionia SW Renovation Completed 2006 $2,100,000 show
Grand Rapids Public Library Bldg 60 Library Plaza NE Renovation Completed 2003 $17,000,000 show
Grand Woods Lounge 77 Grandville SW Renovation Completed 2006 $1,600,000 show
Grandville Avenue Reconstruction - Oakes to Weston Grandville Avenue Renovation Under Construction 2011 n/a show
GRCC 143 Bostwick NE Renovation Completed 1998 $535,000 show
GRCC Applied Technology Ctr 151 Fountain NE New Construction Completed 1991 $25,000,000 show
GRCC Expansion - Old Davenport Campus 415 Fulton St E Renovation Planned 2012 $15,000,000 show
GRCC Lyon St. Pkg Ramp (770 spaces) 25 Lyon St. NE New Construction Completed 1994 $8,000,000 show
GRCC Main Building 143 Bostwick Ave NE Renovation Completed 2001 $6,000,000 show
GRCC Mall Area Bostwick NE Public Works Completed 2000 $1,000,000 show
GRCC Natural Science Bldg 226 Bostwick NE New Construction Completed 2001 $30,000,000 show
GRCC Parking Ramp 140 Bostwick Ave NE Renovation Completed 1990 $4,320,000 show
GRCC Parking Ramp Rehab 140 Bostwick Renovation Completed 2001 $500,000 show
GRCC Spectrum Theater 160 Fountain St NE Renovation Completed 1997 $5,300,000 show
GRCC Street Lighting Entire Campus Renovation Completed 1999 $360,000 show
GRCC Student Ctr & Pkg Ramp 110 Lyon NE New Construction Completed 1981 $6,000,000 show
Gunn Block 007 Ionia SW Renovation Completed 1981 $125,000 show
Gus Bus Parking Lots N/A Public Works Completed 1988 $4,500,000 show
GVSU - Keller Engineering Building 301 Fulton W. New Construction Completed 2000 $7,000,000 show
GVSU - Richard M. DeVos Center 510 Fulton St SW New Construction Completed 2000 $56,500,000 show
GVSU - Secchia Hall Apartments 400 Fulton St SW New Construction Completed 2000 $7,850,000 show
GVSU - Health Professions Bldg. 301 Michigan NE New Construction Completed 2003 $57,000,000 show
GVSU - Winter Hall Winter SW New Construction Completed 2003 $11,700,000 show
GVSU College of Engineering Kennedy Hall 301 W Fulton New Construction Completed 2007 $16,000,000 show
GVSU Eberhard Center 301 Fulton W New Construction Completed 1988 $22,000,000 show
GVSU New Parking Structure Lake Michigan Dr & Seward New Construction Completed 2004 $20,000,000 show
GVSU Seidman College of Business 38 Front Ave New Construction Proposed 2012 $40,000,000 show
Health Park Central 245 Cherry SE New Construction Planned 2011 $30,000,000 show
Heart of the City Health Center 211 LaGrave SE New Construction Planned 2010 $30,000,000 show
Heartside Ministries 052 Division S Renovation Completed 2001 $523,581 show
Heartside Park 300 Block Ionia Public Works Completed 2003 $530,000 show
Helen Devos Children's Hospital 621 Sheldon Blvd SE New Construction Completed 1995 $47,000,000 show
Herkimer Apartments 323 S Division Renovation Completed 1995 $5,000,000 show
Holiday Inn Express 310 Pearl NW Renovation Completed 2009 n/a show
Hope Lodge 240 Jefferson SE New Construction Completed 2007 $6,800,000 show
Hopson Flats Apartments/Retail 212-216 Grandville SW Renovation Completed 2007 $9,000,000 show
Houseman & Braundy Bldg 132-140 Monroe Center NW Renovation Completed 1986 $2,200,000 show
Houseman Building 104 Monroe Center NW Renovation Completed 2006 $400,000 show
I-196 Rebuild from Grand River to Fuller I-196 Renovation Under Construction 2010 $40,000,000 show
Icon on Bond Condominiums Trowbridge and Bond New Construction Completed 2007 $30,000,000 show
Independent Liberty Building Rehab 126 Ottawa NW Renovation Replaced 1980 $360,000 show
Intersection Lounge 133 Grandville SW Renovation Completed 2002 $151,000 show
Interurban Transit Partnership Office 300 Ellsworth SW Renovation Completed 2002 $1,700,000 show
Ionia Ave Historic Streetscape Cherry to Bartlett Public Works Completed 2000 $1,054,000 show
Ionia Avenue Bartlett to Wealthy Public Works Completed 2003 $1,717,000 show
Ionia Avenue Fountain to Michigan Public Works Completed 2005 $1,200,000 show
Ionia Avenue Lyon to Michigan Public Works Completed 2006 $2,500,000 show
Ionia Avenue Historic Streetscape Fulton to Oakes Public Works Completed 1996 $1,500,000 show
Ionia Avenue Historic Streetscape Oakes to Cherry Public Works Completed 1999 $1,466,000 show
Ionia Avenue Reconstruction Fulton to Fountain Public Works Completed 2009 $2,000,000 show
ITP Central Station Grandville and Bartlett New Construction Completed 2004 $23,000,000 show
ITP/The Rapid - Wealthy Operations Facility 320 Bartlett SW New Construction Under Construction 2011 $33,000,000 show
JW Marriott Hotel & Parking Structure 101 Campau NW New Construction Completed 2007 $115,000,000 show
Karl Building 098 Monroe Center NW Renovation Completed 1982 $55,000 show
Kelsey Apts - 12 Live/Work units 235 S Division Renovation Completed 2006 $3,300,000 show
Kendall Building 15 Monroe Center NW Renovation Planned 2011 $4,000,000 show
Kendall College/Ferris Building 120 Ionia NW Bldg Renovation Completed 1999 $2,000,000 show
Kendall School of Design 111 Division N. Renovation Completed 1989 $1,300,000 show
Kent County Courthouse 180 Ottawa NW New Construction Completed 2001 $60,000,000 show
LaGrave Ave. Fire Station 038 LaGrave SE Renovation Completed 1987 $1,000,000 show
LaGrave Church 107 LaGrave Av SE Addition Completed 1997 $2,700,000 show
Landmark Lofts-Phase I 801 Monroe NW Renovation Completed 2001 $1,900,000 show
Ledyard Bldg 118 Monroe Center, 125-145 Ottawa NW Renovation Completed 1987 $9,200,000 show
Ledyard Building 125 Ottawa NW Renovation Completed 2007 $1,200,000 show
Lenox Apartments 351 S Division Av Renovation Completed 1998 $2,000,000 show
Loose Leaf Building Apartments 333 Commerce SW Renovation Completed 2008 $3,300,000 show
Lorraine Bldg 124 Fulton SE Renovation Completed 1984 $500,000 show
Louis Benton Steak House 75 Monroe Center Renovation Completed 2003 $1,000,000 show
Louis Campau Parking Ramp 043 Monroe NW New Construction Completed 1985 $4,100,000 show
Louis Campau Promenade - Phase I Monroe & Campau Public Works Replaced 1983 $175,000 show
Louis Campau Promenade - Repair Phase I Monroe to Campau Public Works Completed 2009 $1,000,000 show
Louis Street Reconstruction Campau to Grand River,Ottawa to Fulton Public Works,Public Works Completed,Planned 2003,2009 $16,940,005,000,000 show
Louis Street Reconstruction Campau to Grand River,Ottawa to Fulton Public Works,Public Works Completed,Planned 2003,2009 $16,940,005,000,000 show
Lyon Square Monroe to River Public Works Completed 1985 $640,000 show
Lyon Square Improvements n/a show
Lyon Street Reconstruction Monroe to Division Public Works Completed 2002 $2,068,000 show
Market Avenue Fulton to Finney Public Works Completed 1996 $2,850,000 show
Market Avenue Reconstruction Finney to Wealthy Public Works Completed 1997 $1,225,000 show
Market Square/Bistro Bella Vita 44 Grandville SW Renovation Completed 1997 $2,500,000 show
Mary Free Bed 235 Wealthy SE Renovation Completed 2002 $587,000 show
Mary Free Bed 200 Wealthy SE. Addition Completed 1989 $500,000 show
Mary Free Bed - Mary Ives Hunting Bldg 360 Lafayette Av SE New Construction Completed 2001 $4,511,309 show
Mary Free Bed Hospital 235 Wealthy Renovation Completed 2001 $3,775,000 show
Mary Free Bed Hospital 235 Wealthy Renovation Completed 1996 $855,626 show
Mary Free Bed Parking Ramp 350 Lafayette Ave SE,350 Lafayette SE Addition,Addition Completed,Completed 1993,1994 $18,000,001,825,000 show
Mary Free Bed Pkg Fac 350 Lafayette Ave SE,350 Lafayette SE Addition,Addition Completed,Completed 1993,1994 $18,000,001,825,000 show
Mary Free Bed Prof Bldg 350 Lafayette Av SE Addition Completed 1998 $1,525,000 show
Mary Free Bed Prof. Bldg 350 Lafayette Ave SE Addition Completed 1995 $2,798,000 show
Mary Free Bed Professional Building 350 Lafayette Renovation Completed 2002 $587,000 show
Mary Free Bed Profl Med Ctr & Pkg 350 Lafayette & 235 Wealthy SE New Construction Completed 1989 $8,300,000 show
Masonic Temple 233 Fulton NE Renovation Completed 1985 $750,000 show
Mel Trotter Bldg 225 Commerce SW Renovation Completed 1998 $2,530,000 show
Mel Trotter Shelter 225 Commerce Av SW Renovation Completed 2001 $4,500,000 show
Metropolitan Park Apartments 334 Ionia SW New Construction Completed 2007 $3,300,000 show
Michigan Hill Project Tower 25 (Phase I) 25 Michigan NW New Construction Completed 2009 $60,000,000 show
Michigan Hill Project Tower 35 (Phase 2) 35 Michigan NW New Construction Under Construction 2011 $60,000,000 show
Michigan State University College of Human Medicine 15 Michigan NW New Construction Completed 2010 $90,000,000 show
Michigan Street Barclay to Union Public Works Completed 1997 $1,875,000 show
Michigan Street Monroe to Barclay Public Works Completed 1995 $1,875,000 show
Michigan Street Bridge - at Division Ave Michigan & Division Public Works Completed 2007 $4,000,000 show
Minnhaar Building 049 Monroe Center NW Renovation Completed 1980 $500,000 show
Monroe Avenue NW - Reconstruction Michigan to Newberry Public Works Completed 2001 $3,000,000 show
Monroe Center - Phase II Ottawa to Monroe Public Works Completed 2001 $8,535,909 show
Monroe Center II Ramp - 554 Spaces Louis NW New Construction Completed 2002 $12,000,000 show
Monroe Center Mall Pearl to Fulton Public Works Replaced 1980 $4,500,000 show
Monroe Center Phase I Ottawa to Division Public Works Completed 1997 $6,425,000 show
Monroe North Hotel - Suburban Inn 748 Monroe NW New Construction Planned 2011 $28,000,000 show
Monroe Terrace 600 Monroe Renovation Completed 2002 $3,000,000 show
Mr. Fables 216 Division N. Renovation Replaced 1983 $155,000 show
National City Building 171 Monroe NW Renovation Completed 1998 $850,000 show
Next Work Lofts 111 Division S Renovation Planned 2009 $3,800,000 show
North Parking Structure - Spectrum 251 Michigan Ave NE Addition Completed 2001 $7,500,000 show
Oakes Street Park Oakes & Ionia Public Works Completed 2005 $64,000 show
Old Iron Rail Road Bridge N/A Public Works Completed 1988 $900,000 show
One Ionia Place 001 Ionia SW Renovation Completed 1982 $700,000 show
One Trick Pony 136 Fulton E Renovation Completed 1997 $250,000 show
Ottawa Apts - Swift Printing 400 Bridge NW Renovation Completed 2001 $1,900,000 show
Ottawa Avenue Fairbanks to Hastings Public Works Completed 2007 $2,000,000 show
Ottawa Avenue Reconstruction Fountain to Michigan Public Works Completed 1998 $1,100,000 show
Ottawa-Fulton Parking Ramp 22 Ottawa Ave NW New Construction Completed 1997 $11,100,000 show
Parke-Century Bldg 168 Louis Campau NW Renovation Completed 1983 $1,500,000 show
Peacock Bldg 150 Fulton E. Renovation Completed 1985 $100,000 show
Pearl & Ionia City Parking Ramp 028 Pearl NW New Construction Completed 1992 $8,500,000 show
Pearl Street Monroe to Ottawa Public Works Completed 2002 $2,300,000 show
Pearl Street Ottawa to Division Public Works Completed 2005 $1,575,000 show
Pearl Street Bridge N/A Public Works Completed 1985 $2,800,000 show
Peck Bldg 34 Monroe Ctr NW Renovation Completed 1999 $2,000,000 show
Peninsular Club 120 Ottawa NW Renovation Completed 2005 $1,300,000 show
Penisular Club 120 Ottawa NW Addition Completed 1996 $1,300,000 show
Penn Plaza 126 Ottawa NW Renovation Completed 1998 $225,000 show
Penn Plaza 126 Ottawa NW Renovation Completed 2000 $820,000 show
Peoples Bldg 60 Monroe Center NW Renovation Completed 2004 $2,020,000 show
Peoples Bldg - Select Bank 60 Monroe Center NW Renovation Completed 2004 $3,000,000 show
Peoples Building 60 Monroe Center NW Renovation Completed 1986 $4,600,000 show
Photo Studio 312 Ellsworth SW Renovation Completed 2000 $200,000 show
Plante & Moran Building 634 Front NW New Construction Completed 2008 $10,300,000 show
Plaza Towers 011 Monroe NW Renovation Completed 1998 $34,000,000 show
Procare System Building 61 Commerce SW Renovation Completed 2008 $3,000,000 show
Public Library Parking Lot Improv 060 Library Plaza NE Public Works Completed 1988 $180,000 show
Public Museum Mini-Park & Parking Jefferson & State St. Public Works Completed 1980 $30,000 show
Purple East 250 Ionia SW New Construction Completed 2000 $1,700,000 show
Ransom Ave. Senior Citizen Housing 050 Ransom NE New Construction Completed 1980 $5,800,000 show
Rapids Park Between Hall of Justice & River Public Works Replaced 1981 $20,000 show
River City Building 201 Monroe NW Renovation Completed 2010 $10,000,000 show
River City Slims 243 Commerce SW Renovation Completed 2007 $1,600,000 show
River Front Plaza 055 Campau NW Renovation Completed 1998 $3,885,000 show
River House Condominiums 335 Bridge NW New Construction Completed 2008 $80,000,000 show
Riverbank Boardwalk Fulton to Michigan Public Works Completed 1992 $1,700,000 show
Riverfront Plaza 55 Campau Av NW Renovation Completed 2001 $4,000,000 show
Riverfront Plaza Bldg 55 Campau NW Addition Completed 2006 $3,200,000 show
Riverfront Plaza Bldg 055 Campau NW Addition Completed 1986 $7,500,000 show
Rood Building 139 Pearl NW Renovation Planned 2011 n/a show
Seward Avenue Extension - Fulton to Lexington Seward Ave New Construction Planned 2012 $3,400,000 show
Showgirl Galleria 234 Market SW Renovation Completed 2006 $1,000,000 show
Sierra Room 25 Ionia Av SW Renovation Completed 1997 $1,800,000 show
Singer Sculpture East Riverbank north of Fulton St Public Works Completed 1995 $1,300,000 show
Spectrum Health 100 Michigan NE Renovation Completed 2001 $9,200,000 show
Spectrum Health 100 Michigan NE Renovation Completed 2001 $5,263,000 show
Spectrum Health - Cardiac Center 100 Michigan St NE New Construction Completed 2004 $137,000,000 show
Spectrum Health - Cook Institute 251 Michigan St NE Addition Completed 1996 $3,200,000 show
Spectrum Health - Helen DeVos Children's Hospital 100 Michigan NE New Construction Under Construction 2011 $265,000,000 show
Spectrum Health - Helen DeVos Pavilion 330 Barclay New Construction Completed 1996 $8,000,000 show
Spectrum Health - Lemmon-Holton Cancer Pavilion 145 Michigan NE New Construction Completed 2008 $78,000,000 show
Spectrum Health - Neo Natal Care Unit 100 Michigan NE Renovation Completed 1997 $6,400,000 show
Spectrum Health - Patient Care Unit 100 Michigan NE Renovation Completed 1997 $1,600,000 show
Spectrum Health - Pkg Rmp Exp (750 spaces) 421 Lafayette NW New Construction Completed 2004 $7,340,000 show
Spectrum Health - Renucci Hospitality House Ransom Ave NE New Construction Completed 1999 $3,861,000 show
Spectrum Health- Barclay Pkg Ramp Barclay Ave NE New Construction Completed 2001 $10,000,000 show
Spectrum Health Bldg 100 Michigan NE New Construction Completed 1995 $5,800,000 show
Spectrum Health Butterworth Hospital 100 Michigan St NE Renovation Completed 1994 $2,800,000 show
Spectrum Health East Pkg Ramp 216 Michigan St NE New Construction Completed 1994 $3,200,000 show
Spectrum Health Musculoskeletal Ctr 230 Michigan St NE New Construction Completed 1994 $5,775,000 show
Spectrum Health NorthPkg Ramp 201 Michigan St NE New Construction Completed 1992 $3,500,000 show
Specturm Health-- Emergency Barclay NE Renovation Completed 2003 $13,100,000 show
Square Center Bldg 169 Monroe NW Renovation Completed 1983 $1,500,000 show
St Mary Health Services - Lacks Cancer Ctr Cherry/Jefferson New Construction Completed 2004 $45,000,000 show
St Mary's Health Services 200 Jefferson SE Renovation Completed 2001 $10,000,000 show
St Mary's Health Services 200 Jefferson Av SE Renovation Completed 1995 $900,000 show
St Mary's Wege Center for Health & Learning 320 Lafayette Ave SE New Construction Completed 1999 $2,350,000 show
St Mary's Wege Center Pkg Ramp 300 Lafayette Ave SE New Construction Completed 1999 $2,100,000 show
St. Cecelia Music Society 024 Ransom NE Renovation Completed 1998 $2,552,000 show
St. Cecelia Music Society 024 Ransom NW Renovation Completed 1987 $2,000,000 show
St. Cecilia Music Society 24 Ransom Av NE Renovation Completed 2000 $2,350,000 show
St. George Orthodox 334 LaGrave SE Renovation Completed 1998 $1,000,000 show
St. George Orthodox 334 LaGrave SE New Construction Completed 1999 $400,000 show
St. Mary's Prof Bldg 300 Lafayette Ave SE New Construction Completed 1998 $5,042,000 show
St. Mary's Hauenstein Center 200 Jefferson SE New Construction Completed 2009 $60,000,000 show
St. Mary's Health Park 245 Cherry SE New Construction Completed 1989 $3,850,000 show
St. Mary's Health Services 200 Jefferson SE Renovation Completed 1989 $4,000,000 show
St. Mary's Hospital 200 Jefferson SE Renovation Completed 2001 $746,000 show
St. Mary's Hospital 200 Jefferson SE Renovation Completed 2001 $826,000 show
St. Mary's Hospital 200 Jefferson Ave SE Renovation Completed 2001 $405,000 show
St. Mary's Hospital 200 Jefferson SE Renovation Completed 1998 $2,180,000 show
St. Mary's Hospital 200 Jefferson SE Renovation Completed 2001 $1,050,000 show
Steketees Department Store 028 Fountain NW Renovation Replaced 1986 $3,200,000 show
Stella's/Viceroy 53 Commerce Renovation Under Construction 2010 n/a show
Stelter Bldg 300 Ionia SW Renovation Completed 2003 $562,986 show
Tannery Row 16 Ionia Av SW Renovation Completed 1997 $1,681,000 show
Taps Dance Club 048 Fulton W Renovation Completed 1999 $200,000 show
Taps Sports Bar 008 Ionia SW Renovation Completed 1998 $350,000 show
The B.O.B. 20 Monroe Av NW Renovation Completed 1997 $3,600,000 show
The B.O.B. - Addition 020 Monroe NW Addition Completed 2001 $1,000,000 show
The Black Rose Irish Pub 100 Ionia Renovation Completed 2004 $830,000 show
The Gallery on Fulton 2 Fulton W New Construction Under Construction 2010 $30,000,000 show
The Gallery on Fulton Parking Ramp 2 Fulton W New Construction Under Construction 2010 $9,400,000 show
The Law Building 330 Ionia NW New Construction Completed 1995 $7,000,000 show
The Loft Apartments 75 Sheldon Blvd SE Renovation Completed 1999 $5,000,000 show
The Pyramid Scheme 68 Commerce Renovation Proposed 2011 n/a show
The Republic/ Rockwell 45 Division S Renovation Completed 2008 $5,000,000 show
The Van Andel Institute 333 Bostwick NE Renovation Completed 2001 $2,000,000 show
Thirty Eight 38 Commerce SW New Construction Completed 2010 $15,600,000 show
Tiki Bob's 058 Ionia SW Renovation Completed 2002 $750,000 show
Torco Building 47 Commerce SW Renovation Completed 2006 $2,000,000 show
Trade Center Bldg 050 Louis NW Renovation Completed 1983 $1,500,000 show
Trade Center Building 50 Louis NW Renovation Completed 2006 $1,500,000 show
Transitions Inc Bldg 201 Sheldon SE Renovation Completed 1990 $1,200,000 show
Travel Consultants 32 Market SW Renovation Completed 1997 $1,200,000 show
Trust Bldg 040 Pearl NW Renovation Completed 1983 $2,200,000 show
Trust Building 040 Pearl NW Renovation Completed 2001 $540,000 show
Trust Building - Standard Federal 040 Pearl NW Renovation Completed 2002 $840,000 show
Two Fountain Place 002 Fountain NE Renovation Completed 1986 $1,600,000 show
U.I.C.A. Bldg 41 Sheldon Blvd SE Renovation Completed 1998 $1,600,000 show
Union Square Condominiums 600 Broadway NW Renovation Completed 2007 $18,000,000 show
United Way Center 118 Commerce SW Renovation Completed 2000 $1,289,000 show
Uno Oolio's 188 Monroe NW Renovation Replaced 1983 $100,000 show
Urban Market 435 Ionia Ave SW Renovation Planned 2012 $31,000,000 show
Urban Wellness Center 975 Ottawa Ave NW Renovation Planned 2011 $2,700,000 show
US 131 Exit Ramp-Cherry & Oakes St Cherry & Oakes St. Public Works Completed 1999 $7,937,000 show
US Bankruptcy Court 1 N Division Renovation Completed 2006 $4,000,000 show
US Exchange/Choice One 056 Grandville SW Renovation Completed 1999 $1,700,000 show
Van Andel Arena 130 W Fulton St New Construction Completed 1996 $77,000,000 show
Van Andel Institute 333 Bostwick NE New Construction Completed 1999 $70,000,000 show
Van Andel Institute - Phase II 333 Bostwick NE Addition Completed 2010 $175,000,000 show
Vanderlende Bldg 131 Division S Renovation Completed 1999 $252,500 show
Verne Barry Place 60 S Division Renovation Completed 2008 $17,000,000 show
Washington Square Medical Bldg Rehab 309 Jefferson SE Renovation Completed 1980 $600,000 show
Waters Bldg 161 Ottawa NW Renovation Completed 1988 $1,600,000 show
Weather Protected Walkway Across Pearl St. Public Works Completed 1982 $400,000 show
Welsh Civic Auditorium 245 Monroe NW Renovation Replaced 1985 $6,000,000 show
Wenham Building 020 Monroe Center NE Renovation Completed 1982 $700,000 show
Westminster Church Expansion 047 Jefferson SE Addition Completed 1986 $1,000,000 show
Westminster Presbyterian Church 047 Jefferson SE Addition Completed 2001 $1,500,000 show
Westminster Presbyterian Church 047 Jefferson SE Renovation Completed 1998 $145,000 show
Weston Apartments 021 Weston SW & 044 Ionia SW Renovation Completed 1984 $8,200,000 show
Weston East Apts 21 Weston SW Renovation Completed 2007 $6,650,000 show
Weston St. Extension N/A Public Works Replaced 1989 $355,000 show
Weston Street Sheldon to Division Public Works Completed 2002 $510,000 show
Weston West Apts 44 Ionia SW Renovation Completed 2007 $6,650,000 show
White-Godfrey Bldg Renovation Completed 1988 $330,000 show
Willard Building - Bobby J's Restaurant 150 E Fulton Renovation Completed 2006 $500,000 show
Women's Health Center of West Michigan 555 Mid Towne New Construction Completed 2008 $25,000,000 show
YMCA Building 033 Library NE Renovation Replaced 1991 $4,000,000 show
YMCA Renovation 033 Library NE Renovation Replaced 1986 $1,000,000 show
YWCA Building 025 Sheldon SE Renovation Completed 1993 $1,800,000 show
Total Projects= 409 Total Investment= $91,483,894,819,859